How to Schedule the Test Plan

You can access the Scheduler page to schedule Tags/Test scripts at a specific time.

  1. Log in as the Manager/ Test Engineer.

  2. Create Test, Record & Save.

  3. Navigate to the Executions Page.

  4. Click on the Schedule tab.

  5. Select a Tag/Test name & enter the values for the following mandatory fields: Name, Description, Frequency (Hourly, Weekly & Monthly), and Date.

  6. Click on the Create Schedule button.

  7. Select needed environments in the Test Configuration Environment window and click Submit.

  8. Users can schedule tests with the following possibilities:

  • Can schedule single Tag with one test config environment (single browser)

  • Can schedule individual Test under various Tags with one test config environment (single browser) 

  • Can schedule multiple Tags with one test config environment (single browser)

  • Can schedule individual Test under various Tags with Multiple browsers and test configuration environments.

  • Can schedule multiple Tags with Multiple browsers and Test config environments.

  1. Now the scheduled Tag is displayed in the Scheduler Table list .

  2. The scheduled Tags/ Test will be executed at the arranged time.

 

Watch this video on how to schedule the test plan:

 

Previous:

©2023 GoTestPro. All Rights Reserved.